The emergency spillway ("B" line) and the supply ditch inlet ("C" line) where Elk Hollow Creek water drops into the pond. Drag to pan, wheel-drag or right-drag to turn, scroll to zoom; on a phone, drag to spin and pinch to zoom.
Built from WET Rev-1 plans (10/16/2026): spillway profile and sections Sheet 4, rock sill and ditch outfall Sheet 7. Existing ground is approximate (plan profiles and the 10/30 drone surface). For understanding, not for staking.